Expertise : refurbishment : Dun Laoghaire East Pier Paving

DUNLAOGHAIRE EAST PIER PAVING

The Dunlaoghaire East Pier is 1300 metres long and was built between 1817 and 1823.

The works undertaken involved the removal of the existing surface and replacement with a new polished surface for the entire lower level of the Pier. This is the most walked and widest section of the Pier.

This phase also included the wharf built on the Pier in 1827 beside the bandstand to accommodate the Admiralty Mail Packet, and the wider Berth No 1, which was built for ferries in the middle of the last century.

CLIENT
Dunlaoghaire Harbour Company

LOCATION
Dunlaoghaire Rathdown

VALUE
€2.8 million

PRINCIPAL ENGINEER
Shafferty Assoc Engineer Moylan Consulting Engineers

CONTRACT PERIOD
January 2005 – August 2005



 